{"id":99219,"date":"2023-05-15T16:35:00","date_gmt":"2023-05-16T00:35:00","guid":{"rendered":"https:\/\/www.juneauempire.com\/news\/docks-and-harbors-celebrates-completion-of-marine-park-deckover-project\/"},"modified":"2023-05-15T16:35:00","modified_gmt":"2023-05-16T00:35:00","slug":"docks-and-harbors-celebrates-completion-of-marine-park-deckover-project","status":"publish","type":"post","link":"https:\/\/www.juneauempire.com\/news\/docks-and-harbors-celebrates-completion-of-marine-park-deckover-project\/","title":{"rendered":"Docks and Harbors celebrates completion of Marine Park deckover project"},"content":{"rendered":"

Though it might not look to be all that mighty of a feat, the City and Borough of Juneau’s Docks and Harbors Marine Deckover Project was anything but easy, according to Port Director Carl Uchytil Monday afternoon.<\/p>\n

“This was a very challenging project,” he said.<\/p>\n

Around a dozen residents and city officials gathered at the beginning of the downtown Seawalk under a bright sunny sky to witness the ribbon-cutting ceremony to celebrate the successful completion of the project which extends the existing Seawalk into Marine Park via an Americans with Disabilities Act-accessible dock structure and lengthens the waterfront from Merchant’s Wharf to Franklin Dock.<\/p>\n

Planning and design work for the roughly $2.5 million project began in early 2020, and now the area’s completed upgrades include new timber for the ramp, a cast-in-place concrete dock, new safety railings and improved lighting of the area.<\/p>\n

In total, the project’s construction took from October 2022 to April of this year to complete, Uchytil said, and during that time the construction efforts saw a fair share of challenges like an “unseasonably cold winter,” changing tides and taking precautions to avoid impacting marine life in the area.<\/p>\n

However, Uchytil and CBJ Harbormaster Matthew Crestwell said the project was a success and will further enhance the waterfront experience in Juneau.<\/p>\n

• Contact reporter Clarise Larson at clarise.larson@juneauempire.com or (651)-528-1807.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"

A ribbon-cutting ceremony was held Monday afternoon. <\/p>\n","protected":false},"author":890,"featured_media":99220,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_stopmodifiedupdate":false,"_modified_date":"","wds_primary_category":9,"footnotes":""},"categories":[9,4],"tags":[765,75],"yst_prominent_words":[],"class_list":["post-99219","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-home","category-news","tag-city-and-borough-of-juneau","tag-local-news"],"_links":{"self":[{"href":"https:\/\/www.juneauempire.com\/wp-json\/wp\/v2\/posts\/99219","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.juneauempire.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.juneauempire.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.juneauempire.com\/wp-json\/wp\/v2\/users\/890"}],"replies":[{"embeddable":true,"href":"https:\/\/www.juneauempire.com\/wp-json\/wp\/v2\/comments?post=99219"}],"version-history":[{"count":0,"href":"https:\/\/www.juneauempire.com\/wp-json\/wp\/v2\/posts\/99219\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.juneauempire.com\/wp-json\/wp\/v2\/media\/99220"}],"wp:attachment":[{"href":"https:\/\/www.juneauempire.com\/wp-json\/wp\/v2\/media?parent=99219"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.juneauempire.com\/wp-json\/wp\/v2\/categories?post=99219"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.juneauempire.com\/wp-json\/wp\/v2\/tags?post=99219"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/www.juneauempire.com\/wp-json\/wp\/v2\/yst_prominent_words?post=99219"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}